760-884-3113
Free Proposal

Solar Energy Projects in San Diego and Surrounding Areas


Please browse through these projects to get an idea of the scope and scale of just a small fraction of the work that we have been involved with at Integrity Solar Electric Corp. and Valley Center Solar, a flourishing branch of our solar energy business. What drives us is being a trusted partner from the design, all the way through implementation of our projects. Our entire staff takes great pride in installing all of our systems. We feel that we are changing the world for the better, one system at a time. We truly feel that we make a difference with the products that we implement in the marketplace, and it's one of the greatest feelings we get when we work with a client looking to place a solar system on their property.

It’s people like you see on the pages here that have made the commitment to the future and have made a positive impact by simply going beyond looking at a solar solution, but they took advantage of the programs available to also keep the systems affordable. With pricing on the technology at all-time lows, and incentive programs that are still available, it couldn't be a better time to put a solar electrical system to work for you TODAY!


Residential

Our goal is to provide you with honest sale, top quality installation and a customer service at a fair price.

Helping you add value to your house and taking advantage of 30%tax credit through the federal gov.

We encourage you to research our installer’s license history insurance certifications, and references to insure you a positive solar experience.

La Jolla Project


Commercial

Call one of our Senior Solar Consultants to find out how your commercial project may qualify for incentives including state and local rebates, federal tax credits or tax grants, MACRS 5 year accelerated depreciation, Renewable Energy Credits, LEED Green Building points, and discounted utility rates.

The Shops at Mission Viejo, 173kW Solar Electric System

Blue Oak Energy was the design firm for a 173kW rooftop system at the Shops at Mission Viejo, a major retail center in Orange County. Blue Oak Energy concentrated its efforts and was able to procure a permit in one week and Valley Center Solar's Team (formerly part of Clean Power Systems before teaming up with Integrity Solar Electric Corp.) finished construction and commissioning within a month. With limited space and options for locating electrical equipment, carefully planned solutions were required for inverter placement and AC conduit routing. The result was a string-monitored system delivered in time for the holidays. Valley Center Solar's Team partnered with Blue Oak as the General Contractor for this project and was responsible for all construction activities on this project.

REI San Carlos, 100kW Solar Electric System

REI's San Carlos location, in the southern Bay Area, now benefits from a new 100kW photovoltaic system designed by Blue Oak Energy. This site presented several design challenges, including the requirements of the local Fire Marshall. An elegant solution was devised that allows for accessibility by fire and maintenance personnel to the rooftop. Again Valley Center Solar's Team partnered with Blue Oak as the General Contractor for this project and was responsible for all construction activities on this project.

REI San Diego, 100kW Solar Electric System

San Diego has hot, dry weather, ideal for solar electric systems. The REI store in San Diego is benefitting from the sunny climate, as we recently installed a nearly 100kw system on its rooftop. This practical and robust PV system offsets approximately 40% of the store's electricity demand. Valley Center Solar's Team again partnered with Blue Oak as the General Contractor for this project and was responsible for all construction activities on this project.

Lake Turner

A 1 Megawatt AC, 7 acre Single Axis Tracker system designed by World Water for the Valley Center Municipal Water District and Solar Power Partners (SPP). Valley Center Solar's Team (Formerly part of Clean Power Systems) was awarded the contract as General Contractor for the Lake Turner Project and was responsible for all construction activities except the Civil and Earth work. Clean Power completed the build on this project in a short build out window of 90 days. ($8,000,000+ Total Project Cost).

St. Mary Medical Center

Valley Center Solar's Team developed a solar energy facility for Solar Power Partners (SPP) and St. Mary Medical Center in Southern California's beautiful high desert Apple Valley region. The system, which was financed using SPP's solar Power Purchase Agreement (PPA), will provide an estimated 372,774 kWh per year of electricity for the district, which is equivalent to 268 metric tons of carbon dioxide off set, or 30,420 gallons of gasoline emissions. Valley Center Solar's Team provided complete Design / Build services for this project.

Carlee’s Project

License # (B/C10 1011442) | Integrity Solar Electric Corp. |
2120 W Mission Rd., Ste. 130, Escondido, CA 92029
| 760-884-3113 | information@integrity-solar.com